RAAF Darwin Security Works
- Sam Kuhn

- Jun 2, 2023
- 1 min read
Updated: Aug 6
Project Scope
The scope involves works to the existing “Deploy Support Facility” building at RAAF Darwin to achieve target physical security ratings. Works include building modifications to ground floor and first floor to achieve Zone 4 status with specific areas to achieve Zone 2 and 3. Works include full ceiling replacement, internal repainting works, installation of a new security alarm system and electronic access control system, construction of acoustic walls and internal airlock to a ground floor conference room, replacement of doors, modifications to the existing power outlet arrangement, and replacement of lighting fixtures with new and to include movement sensors.